top of page

The upper carrier sprocket is a dual support wheel, preventing drag chains, sturdy and durable, luxurious sealed cab, equipped with brand engine

 

Basic parameters:
Operating weight of the entire machine(kg)  25000
Bucket capacity(m³)  1.4
Boom length(mm)  5800
Stick length(mm)  2900
Tonnage(tons)  26
rotation speed(rpm)  12.4
Walking speed(km/h)  4.9/3.1
Bucket digging force(kN)  standard 165/177.9
Stick digging force(kN)  standard 107.5/115.3
Rated power(km)  169KW/2000
Total length of transportation(mm)  9610
Total width of transportation(mm)  3200
Full height of the cab(mm)  3030
Boarding width(mm)  2895
Track grounding length(mm)  3600
Total length of track(mm)  3945
track shoe width(mm)  600
Total width of track(mm)  3200
Track gauge(mm)  2500
Ground clearance(mm)  480
Rear end Radius of gyration(mm)  2850

Big Crawler Excavator SD260

€19,999.00價格
增值税  未含
數量
Two months to arrive, book in bulk for a shorter arrival time
    bottom of page